Butler Plank Road slide repair begins Monday in Shaler | TribLIVE.com
TribLive Logo
| Back | Text Size:
https://mirror.triblive.com/local/butler-plank-road-slide-repair-begins-monday-in-shaler/

Butler Plank Road slide repair begins Monday in Shaler

Paul Guggenheimer
| Friday, August 25, 2023 11:17 p.m.
Louis B. Ruediger | Tribune-Review

Slide repair work on Butler Plank Road in Shaler will begin Monday morning.

PennDOT announced the slide repair work will close the portion of Butler Plank Road that is between East Sutter Road and Kleber Road starting at 7 a.m.. Butler Plank Road will remain closed through Friday, Sept. 8.

Through traffic will be detoured.

Here’s the posted detour:

North of the closure

From Butler Plank Road, turn right onto Route 8;

Turn right onto Spencer Lane;

Follow Spencer Lane back to Butler Plank Road.

South of the closure

Same detour in the opposite direction.


Copyright ©2025— Trib Total Media, LLC (TribLIVE.com)