The Route 910 Bridge in West Deer Township will close beginning at 6 a.m. Monday for replacement work.
The bridge spans a branch of Deer Creek between Oak Road and Frontier Drive. Traffic will be detoured through mid-October.
It’s a $1.09 million dollar project, which also includes approach roadway work, and other miscellaneous construction activities.
The posted detour directs drivers onto Cedar Ridge and Middle roads.
Copyright ©2025— Trib Total Media, LLC (TribLIVE.com)